Chat with us, powered by LiveChat

A First Look at Thinking Space Systems’ New Premises

 In News

Thinking Space introduce their new premises, which are currently undergoing preparation for the company’s relocation on 1st December 2011. 

 
Above: Thinking Space Systems’ new premises at unit 10b
Last week, the factory floor was painted and is now ready for the production equipment to be relocated.
 

Above: new factory floor
The new design and production office will be located on the ground floor alongside the factory floor and the new sales office will be on the first floor.  Both offices are currently undergoing electrical work.
 
 
 
 
 Above left: new design office
Above right: new sales office
 
 

Recent Posts

Leave a Comment

Start typing and press Enter to search